The Control Of Pollution (oil storage) Regulations 2001 requires that secondary containment (bunds) must have the integrity and capacity to contain a spill or leak should one occur. PPG2 outlines that such bunds must be sound and they must be impermeable to oil and water.
To ensure bund integrity, imperviousness to liquid contents and that they form an effective part of the PIRP, it is essential that they are inspected regularly and that any defects identified in the bund wall or lining are repaired promptly. It is imperative that any draw-off or fill pipes that pass through the bund wall are adequately sealed. It is also important that they are regularly emptied and cleaned to maintain the bund capacity.
Bund lining
Darcy install protective linings to new concrete floored storage areas and/or to refurbish and re-line existing storage areas in line the required regulations. With thirty years experience in protecting concrete, our survey and installation teams will assess the problem and provide an economical solution, enabling you to comply with the requirements of the environment agency's pollution prevention guidelines PPG2. The solution that we can provide will differ from site to site in line with access, budgets and requirements.
Below is a case study on lining of an indoor oil storage area:
CASE STUDY OVERVIEW
After an enquiry through our website, our client had identified that their indoor storage area was not suitable for storing oil and other contaminants
ISSUES IDENTIFIED ON SITE
SOLUTION
FURTHER INFORMATION
© Darcy Spillcare Manufacture 2012 All Rights Reserved all 3rd party trademarks acknowledged.
Darcy Products Ltd. Reg. Office: Darcy Spillcare Manufacture, Brook House, Larkfield Trading Estate, New Hythe Lane, Larkfield
Kent ME20 6GN. Reg. 472058. VAT 203 3006 36