Product Code: 0466/BL
Ensure bund integrity with our bund inspection and maintenance service
The Control of Pollution (oil storage) Regulations 2001 requires that secondary containment (bunds) must have the integrity and capacity to contain a spill or leak should one occur. PPG 2 outlines that such bunds must be sound and they must be impermeable to oil and water.
To ensure bund integrity, imperviousness to liquid contents and that they form an effective part of the PIRP, it is essential that they are inspected regularly and that any defects identified in the bund wall or lining are repaired promptly. It is imperative that any draw-off or fill pipes that pass through the bund wall are adequately sealed. It is also important that they are regularly emptied and cleaned to maintain the bund capacity.
We offer a service to inspect your bunded areas in line with regulations to ensure they are impermeable to water.
No specifications have been added for this product.
The remedies we offer include:
Case studies
Please click on the case studies below to view full details on some of the bund inspection and relining services we have carried out:
Further details on the above services can be seen below:
| Structural surveys | As part of our bund remediation package, we offer a service to fully structural test your bunded area to ensure compliance. When we supply a team of technicians to site, we:
|
| Bund maintenance | As part of our bund maintenance package, we offer the option of a full bund clean down by our team.
After our initial survey, the team will dewater the bund (through filter packs if contaminants are present) and, with degreasing agents, fully clean down the bund. |
| Bund relining | Darcy install protective linings to new concrete bunds and/or to refurbish and re-line existing bunds in line the required regulations.
With thirty years experience in protecting concrete, our survey and installation teams will assess the problem and provide an economical solution, enabling you to comply with the requirements of the environment agency's pollution prevention guidelines ppg2 The lining systems we offer range from HDPE (high density polyethylene) to modified epoxy and highly chemical resistant urethane and vinyl systems. The solution that we can provide will differ from site to site in line with access, budgets and requirements. Below are overviews of the products we install:
|
| Bespoke bunding solutions | The Darcy envirobund is a completely versatile and environmentally compliant secondary containment system that offers up to a 40% saving when compared with blockwork and concrete.
Our envirobund is made from modular galvanised steel panels and features a no dig option for cost effective installation around existing tanks and pipework. This tried and tested secondary containment system is in successful operation across the uk. envirobund can be fitted with a bund water control unit which will automatically remove rainwater (but no oil) From the bund in an environmentally safe manner and maintain the capacity of the bund in line with oil storage regulations. |
| Bund dewatering | To maintain 110% bund capacity you will need a mechanism to extract non-contaminated water from the bund.
Darcy have developed a range of bund dewatering systems and bund water control units to remove water from bunds. These greatly reduce waste management costs and have an excellent return on investment. |
No customer reviews have been received for this product.
Submit A Review
Below is a range of related downloads
Bund maintenance and relining brochure
Download